Important
Apply first load to test the assembly. This load should be of equal or greater weight than
loads expected in use. Next, Check and retightens nuts to recommended torque.
In accordance with good rigging and maintenance practices, the wire rope end
termination should be inspected periodically for wear, abuse, and general adequacy. |